1. Inicio
  2. IELTS
  3. Exámenes de práctica
  4. Reading
  5. Reading Note Completion: práctica 2

IELTS Reading · Completar notas

IELTS Reading Note Completion: práctica 2

London's sewers

  • 13 preguntas
  • 15 min
  • Academic

Qué incluye este examen

  1. PassagePreguntas 1–13Under the streets: building London's main drainage

Tipos de pregunta

  • Completar notas
ReadingIELTS Reading Note Completion: práctica 2
Tiempo restante15:00

Passage

Under the streets: building London's main drainage

A In the 1850s much of London's waste still ended up in the Thames. During the hot summer of 1858 the river fell, leaving sewage exposed along its banks, and the smell reached MPs at work in Parliament. A bill to pay for new works became law within 18 days. The task of carrying them out went to Joseph Bazalgette, chief engineer of the Metropolitan Board of Works, and construction began the following year.

B His scheme rested on interception: sewage would be caught before it could enter the river in the city and carried east to the lower Thames. Around 1,100 miles of street drains were to feed some 82 miles of brick-lined main sewers. These ran in three lines on each side of the river, named high, middle and low level, and gravity was expected to do most of the moving, as they sloped towards the east, at their lower ends by as little as two feet per mile.

C That arrangement could not serve everywhere. Much of the low ground south of the river, including Lambeth, lay below the high-water mark, in places by five or six feet, so sewage from low-lying sewers had to be raised by steam-driven pumps at key points. Abbey Mills, in east London, lifted it 36 feet. At Crossness, south of the river, four large engines delivered it into a reservoir, from which it was released, still untreated, at about high water, to be carried off on the ebbing tide.

D Building all this took a vast amount of material and muscle. Thousands of labourers dug the tunnels by hand, and the works swallowed 318 million bricks and 880,000 cubic yards of concrete. Demand for workers pushed up bricklayers' wages by 20 per cent. Bazalgette insisted on Portland cement, which was strong and water-resistant but was then looked on with suspicion because its quality was unreliable. Batches were checked under a quality-control system that he set up, and John Grant, an assistant engineer to the Board, began his experiments on the material in 1858.

E The dimensions of the tunnels were chosen with the future in mind. In a paper of 1865, Bazalgette explained that in crowded districts he had worked from the actual population. Where fewer people lived, he had allowed for growth to 30,000 per square mile, or to 20,000 in outlying districts, and he had assumed a more generous water supply than London then had. According to the London Museum, the tunnels were far larger than first needed, and when he died in 1891 they could still cope comfortably.

F Progress was far from smooth. In the same paper Bazalgette named strikes among the workmen as the main source of difficulty on the high-level sewer, and a long wet season stopped brick-making just as new railways were adding to the demand for bricks. One sewer also had to wait for another project altogether. Part of the low-level line north of the river was to run inside the new Victoria Embankment, which carried a road above an underground railway. When the Prince of Wales opened the system in 1865 this line was still unfinished, held back by the incomplete embankment, which did not open until 1870. The whole scheme was not completed until 1875.

G The beam engines at Crossness were decommissioned in the 1950s, and the engine house is now a museum. Abbey Mills, which replaced steam with electric motors in 1933, is still in use.

Glosario
sewage
waste water and human waste carried away from buildings
high-water mark
the highest level that a river or the sea reaches at high tide
ebbing tide
a tide that is going out, as the water level falls
Portland cement
a strong type of cement used for building
embankment
a wall or bank built along a river to hold back the water
beam engines
large steam engines that work by means of a heavy rocking beam
PassagePreguntas 1–13
Preguntas 1–13 Máx. 2 palabras

Complete the notes below. Choose NO MORE THAN TWO WORDS AND/OR A NUMBER from the passage for each answer.

BUILDING LONDON'S MAIN DRAINAGE
BACKGROUND
summer 1858: sewage left visible along the river's 1
LAYOUT
combined length of the main sewers: about 2
expected to move most of the sewage: 3
smallest eastward fall: 4 per mile
SIZE
growth allowed for: up to 5 people per square mile, except in outlying districts
PUMPING
rise at Abbey Mills: 6
Crossness: once released, sewage taken away by the 7 tide
MATERIALS AND WORKERS
pay rise of 20 per cent for 8
number of bricks: 9
quality checks made on cement 10
DELAYS
north-bank low-level sewer held up by unfinished 11
high-level sewer: main difficulties came from 12 among workmen
wet weather halted brick production while new 13 raised demand

Respuestas y explicaciones

Haz primero el examen: las respuestas te sirven más después de haber respondido.

Mostrar las respuestas y las explicaciones
  1. 1
    banks

    Paragraph A says the falling river left 'sewage exposed along its banks'. Visible means exposed, and the notes already give the river, so banks is the word needed. Parliament is where the smell went, not the sewage.

  2. 2
    82 miles / eighty-two miles

    Paragraph B gives two lengths. The 1,100 miles are street drains, and the notes ask for the main sewers, so the answer is 82 miles. Write the unit too, as the notes do not give it.

  3. 3
    gravity

    Paragraph B says 'gravity was expected to do most of the moving'. The notes ask what would move most of the sewage. Pumps come in paragraph C, but they were needed only where gravity could not do the job.

  4. 4
    two feet / 2 feet / 2 ft / two ft

    Paragraph B says the sewers fell 'by as little as two feet per mile' at their lower ends. The notes already give 'per mile', so only the distance is needed. The 36 feet in paragraph C is a lift by pumps, not a slope.

  5. 5
    30,000 / 30000 / thirty thousand

    Paragraph E says Bazalgette 'allowed for growth to 30,000 per square mile'. The notes set outlying districts aside, and 20,000 is the figure for those, so it is not the answer. Reading to the end of the sentence shows the difference.

  6. 6
    36 feet / 36 ft / thirty-six feet

    Paragraph C says Abbey Mills 'lifted it 36 feet'. Rise in the notes means this lift. Write the unit as well, since the notes do not give it. Two feet is the smallest slope of the main sewers.

  7. 7
    ebbing

    Paragraph C says the sewage was released at about high water, 'to be carried off on the ebbing tide'. High names the moment of release, not the tide that took the sewage away. Untreated describes the sewage, so it cannot fill this gap.

  8. 8
    the bricklayers / bricklayers

    Paragraph D says bricklayers' wages rose by 20 per cent. Labourers are mentioned just before, in the sentence about digging, which makes them tempting. The text does not say their pay rose, so bricklayers is the answer.

  9. 9
    318 million / 318,000,000 / 318000000 / three hundred and eighteen million

    Paragraph D says the works 'swallowed 318 million bricks', meaning they used that many. The other large figure, 880,000 cubic yards, is for concrete, so it does not answer a question about bricks.

  10. 10
    batches

    Paragraph D says 'Batches were checked under a quality-control system', so the checks were made on batches of cement. The year 1858 is tempting, but it dates John Grant's experiments and cannot follow 'cement'.

  11. 11
    embankment / Victoria Embankment

    Paragraph F says the line was 'held back by the incomplete embankment'. Unfinished means incomplete. Embankment and Victoria Embankment name the same thing, so both are accepted. The railway ran there too, but the text does not blame it.

  12. 12
    strikes

    Paragraph F says Bazalgette named 'strikes among the workmen' as the main source of difficulty on the high-level sewer. The notes already give the workmen, so strikes is the word needed. The wet season is a separate problem.

  13. 13
    railways

    Paragraph F says 'new railways were adding to the demand for bricks'. Raised demand means adding to it, so railways is the word needed. The strikes and the wet season are different problems, and they did not add to demand.

Palabras clave de este examen

Passage

interception
stopping something on its way to another place
suspicion
a feeling that something cannot be trusted
unreliable
not able to be trusted to work well every time
outlying
far from the centre of a place
decommissioned
officially taken out of use
Cómo responder a preguntas tipo «Completar notas»Use the headings and labels in a set of notes to find the text's own word.

What the task looks like

The instruction says 'Complete the notes below.' You get short lines under headings, with gaps in them, and a limit such as ONE WORD ONLY.

Notes leave out small words such as 'the' and 'is', so you get fewer grammar clues than in a full sentence. As with a summary, the task tests details, main ideas and word type.

A method to try

1. Read the headings. They show how the notes are organised and which parts of the text you need.

2. Read the line around each gap. What is the label asking for: a place, a reason, a material?

3. Turn the note into a full sentence in your head. 'Reason: lack of ____' becomes 'The reason is that there is not enough ____'. This often shows what is missing.

4. Find that idea in the text, and take the word from there.

5. Check the word against the label as well as the line. Does it really answer what the label asks?

The traps

Your own word: a word that means the same is not the same as the word in the text.

The wrong heading: a detail that looks right may belong under a different heading in the notes. Use the headings to stay in the right place.

Fuller than the note: notes are short, so a long phrase from the text probably contains more than the gap needs.

Worked example

Text: The town's repair café opens on the first Saturday of each month. Volunteers fix small electrical items and clothes, but they cannot take furniture because the hall has no room for it. Visitors pay nothing, although many leave a donation.

Notes: REPAIR CAFÉ Open: first Saturday of the month Will fix: small electrical items, clothes Furniture not accepted. Reason: lack of ____ at the hall Cost: free, donations welcome (ONE WORD ONLY)

Débilspace. It means the same as the word in the text, and it sounds natural after 'lack of'.
Mejorroom. The text says 'the hall has no room for it'. 'Lack of' rewords 'no', but the answer itself comes from the text.

Answers must be taken from words in the text, so a synonym of your own is not the answer, however close its meaning. Look back and find the text's word.

Icono de la app Fleydo IELTS Fleydo: Preparación IELTS

Lleva estos exámenes contigo en el teléfono

Todos los exámenes de estas páginas están también en la app Fleydo: Preparación IELTS para iPhone, iPad y Android, junto con 2.000 palabras de IELTS con audio.

  • Funciona sin conexión una vez que el examen está en tu teléfono
  • 2.000 palabras de IELTS con audio, repetición espaciada y ejercicios cortos
  • Graba tus respuestas de Speaking y vuelve a escucharlas
  • Un plan diario para tu band objetivo y tu fecha de examen
Consíguelo en el App StoreDisponible en Google Play
Escanea para descargarlaAbre el App Store o Google Play, según tu teléfono.

No necesitas cuenta. Sobre la app

Resultado de un examen de práctica IELTS en la app Fleydo: Preparación IELTS: band estimado y porcentaje de aciertos de cada parte
Clase de prueba gratuita

Descubre tu band real de IELTS antes que el examen

Una clase individual online gratuita con un profesor nativo de inglés, especialista en IELTS certificado con Band 8.5+. Recibes un diagnóstico de Speaking en formato real, una estimación honesta de tu band y un plan centrado en los criterios que te restan puntos. Sin pago, sin compromiso.

Online · Individual · Academic y General Training

IELTS es una marca registrada del British Council, IDP: IELTS Australia y Cambridge University Press & Assessment. Fleydo ha elaborado estos exámenes de práctica, que no están aprobados ni respaldados por dichas organizaciones.

App móvil

Fleydo English School en tu bolsillo

Clases, deberes, mensajes y juegos para los alumnos de Fleydo y sus padres. Gratis en iPhone y Android.

Consíguelo en el App StoreDisponible en Google Play
Más sobre la app
Código QR que abre la app de Fleydo English School en el App Store o en Google PlayEscanea para descargarAbre la tienda correcta para tu teléfono.fleydo.com/app
Icono de la app Fleydo IELTS
Fleydo: Preparación IELTS

¿Te preparas para el IELTS?

Fleydo: Preparación IELTS es otra app, con simulacros de las cuatro destrezas. No necesitas una cuenta de Fleydo para usarla.

Ver la app de IELTS
Consíguelo en el App StoreDisponible en Google Play
Exámenes de práctica IELTS

Practica las cuatro destrezas del IELTS

311 exámenes con band al instante, la explicación de cada respuesta y respuestas modelo. Sin registro.

Todos los exámenes de práctica
El FleyPath

La hoja de ruta personal de tu hijo/a — 3, 6 o 12 meses

🚀Inicio
👋Hello
😊Body
🦁Animals
🔢Numbers
🏆Inglés con confianza
Práctica de inglés gamificada

Como un juego — pero aprendiendo de verdad