1. 首页
  2. IELTS
  3. 模拟题
  4. Reading
  5. 雅思阅读 Note Completion 专项练习 2

IELTS Reading · 笔记填空

雅思阅读 Note Completion 专项练习 2

London's sewers

  • 13 道题
  • 15 分钟
  • Academic

本套测试包含

  1. Passage第 1–13 题Under the streets: building London's main drainage

题型

  • 笔记填空
Reading雅思阅读 Note Completion 专项练习 2
剩余时间15:00

Passage

Under the streets: building London's main drainage

A In the 1850s much of London's waste still ended up in the Thames. During the hot summer of 1858 the river fell, leaving sewage exposed along its banks, and the smell reached MPs at work in Parliament. A bill to pay for new works became law within 18 days. The task of carrying them out went to Joseph Bazalgette, chief engineer of the Metropolitan Board of Works, and construction began the following year.

B His scheme rested on interception: sewage would be caught before it could enter the river in the city and carried east to the lower Thames. Around 1,100 miles of street drains were to feed some 82 miles of brick-lined main sewers. These ran in three lines on each side of the river, named high, middle and low level, and gravity was expected to do most of the moving, as they sloped towards the east, at their lower ends by as little as two feet per mile.

C That arrangement could not serve everywhere. Much of the low ground south of the river, including Lambeth, lay below the high-water mark, in places by five or six feet, so sewage from low-lying sewers had to be raised by steam-driven pumps at key points. Abbey Mills, in east London, lifted it 36 feet. At Crossness, south of the river, four large engines delivered it into a reservoir, from which it was released, still untreated, at about high water, to be carried off on the ebbing tide.

D Building all this took a vast amount of material and muscle. Thousands of labourers dug the tunnels by hand, and the works swallowed 318 million bricks and 880,000 cubic yards of concrete. Demand for workers pushed up bricklayers' wages by 20 per cent. Bazalgette insisted on Portland cement, which was strong and water-resistant but was then looked on with suspicion because its quality was unreliable. Batches were checked under a quality-control system that he set up, and John Grant, an assistant engineer to the Board, began his experiments on the material in 1858.

E The dimensions of the tunnels were chosen with the future in mind. In a paper of 1865, Bazalgette explained that in crowded districts he had worked from the actual population. Where fewer people lived, he had allowed for growth to 30,000 per square mile, or to 20,000 in outlying districts, and he had assumed a more generous water supply than London then had. According to the London Museum, the tunnels were far larger than first needed, and when he died in 1891 they could still cope comfortably.

F Progress was far from smooth. In the same paper Bazalgette named strikes among the workmen as the main source of difficulty on the high-level sewer, and a long wet season stopped brick-making just as new railways were adding to the demand for bricks. One sewer also had to wait for another project altogether. Part of the low-level line north of the river was to run inside the new Victoria Embankment, which carried a road above an underground railway. When the Prince of Wales opened the system in 1865 this line was still unfinished, held back by the incomplete embankment, which did not open until 1870. The whole scheme was not completed until 1875.

G The beam engines at Crossness were decommissioned in the 1950s, and the engine house is now a museum. Abbey Mills, which replaced steam with electric motors in 1933, is still in use.

词汇表
sewage
waste water and human waste carried away from buildings
high-water mark
the highest level that a river or the sea reaches at high tide
ebbing tide
a tide that is going out, as the water level falls
Portland cement
a strong type of cement used for building
embankment
a wall or bank built along a river to hold back the water
beam engines
large steam engines that work by means of a heavy rocking beam
Passage第 1–13 题
第 1–13 题 最多 2 个词

Complete the notes below. Choose NO MORE THAN TWO WORDS AND/OR A NUMBER from the passage for each answer.

BUILDING LONDON'S MAIN DRAINAGE
BACKGROUND
summer 1858: sewage left visible along the river's 1
LAYOUT
combined length of the main sewers: about 2
expected to move most of the sewage: 3
smallest eastward fall: 4 per mile
SIZE
growth allowed for: up to 5 people per square mile, except in outlying districts
PUMPING
rise at Abbey Mills: 6
Crossness: once released, sewage taken away by the 7 tide
MATERIALS AND WORKERS
pay rise of 20 per cent for 8
number of bricks: 9
quality checks made on cement 10
DELAYS
north-bank low-level sewer held up by unfinished 11
high-level sewer: main difficulties came from 12 among workmen
wet weather halted brick production while new 13 raised demand

答案与解析

建议先做题:作答之后再看答案,收获更大。

显示答案和解析
  1. 1
    banks

    Paragraph A says the falling river left 'sewage exposed along its banks'. Visible means exposed, and the notes already give the river, so banks is the word needed. Parliament is where the smell went, not the sewage.

  2. 2
    82 miles / eighty-two miles

    Paragraph B gives two lengths. The 1,100 miles are street drains, and the notes ask for the main sewers, so the answer is 82 miles. Write the unit too, as the notes do not give it.

  3. 3
    gravity

    Paragraph B says 'gravity was expected to do most of the moving'. The notes ask what would move most of the sewage. Pumps come in paragraph C, but they were needed only where gravity could not do the job.

  4. 4
    two feet / 2 feet / 2 ft / two ft

    Paragraph B says the sewers fell 'by as little as two feet per mile' at their lower ends. The notes already give 'per mile', so only the distance is needed. The 36 feet in paragraph C is a lift by pumps, not a slope.

  5. 5
    30,000 / 30000 / thirty thousand

    Paragraph E says Bazalgette 'allowed for growth to 30,000 per square mile'. The notes set outlying districts aside, and 20,000 is the figure for those, so it is not the answer. Reading to the end of the sentence shows the difference.

  6. 6
    36 feet / 36 ft / thirty-six feet

    Paragraph C says Abbey Mills 'lifted it 36 feet'. Rise in the notes means this lift. Write the unit as well, since the notes do not give it. Two feet is the smallest slope of the main sewers.

  7. 7
    ebbing

    Paragraph C says the sewage was released at about high water, 'to be carried off on the ebbing tide'. High names the moment of release, not the tide that took the sewage away. Untreated describes the sewage, so it cannot fill this gap.

  8. 8
    the bricklayers / bricklayers

    Paragraph D says bricklayers' wages rose by 20 per cent. Labourers are mentioned just before, in the sentence about digging, which makes them tempting. The text does not say their pay rose, so bricklayers is the answer.

  9. 9
    318 million / 318,000,000 / 318000000 / three hundred and eighteen million

    Paragraph D says the works 'swallowed 318 million bricks', meaning they used that many. The other large figure, 880,000 cubic yards, is for concrete, so it does not answer a question about bricks.

  10. 10
    batches

    Paragraph D says 'Batches were checked under a quality-control system', so the checks were made on batches of cement. The year 1858 is tempting, but it dates John Grant's experiments and cannot follow 'cement'.

  11. 11
    embankment / Victoria Embankment

    Paragraph F says the line was 'held back by the incomplete embankment'. Unfinished means incomplete. Embankment and Victoria Embankment name the same thing, so both are accepted. The railway ran there too, but the text does not blame it.

  12. 12
    strikes

    Paragraph F says Bazalgette named 'strikes among the workmen' as the main source of difficulty on the high-level sewer. The notes already give the workmen, so strikes is the word needed. The wet season is a separate problem.

  13. 13
    railways

    Paragraph F says 'new railways were adding to the demand for bricks'. Raised demand means adding to it, so railways is the word needed. The strikes and the wet season are different problems, and they did not add to demand.

本卷关键词

Passage

interception
stopping something on its way to another place
suspicion
a feeling that something cannot be trusted
unreliable
not able to be trusted to work well every time
outlying
far from the centre of a place
decommissioned
officially taken out of use
笔记填空:答题方法Use the headings and labels in a set of notes to find the text's own word.

What the task looks like

The instruction says 'Complete the notes below.' You get short lines under headings, with gaps in them, and a limit such as ONE WORD ONLY.

Notes leave out small words such as 'the' and 'is', so you get fewer grammar clues than in a full sentence. As with a summary, the task tests details, main ideas and word type.

A method to try

1. Read the headings. They show how the notes are organised and which parts of the text you need.

2. Read the line around each gap. What is the label asking for: a place, a reason, a material?

3. Turn the note into a full sentence in your head. 'Reason: lack of ____' becomes 'The reason is that there is not enough ____'. This often shows what is missing.

4. Find that idea in the text, and take the word from there.

5. Check the word against the label as well as the line. Does it really answer what the label asks?

The traps

Your own word: a word that means the same is not the same as the word in the text.

The wrong heading: a detail that looks right may belong under a different heading in the notes. Use the headings to stay in the right place.

Fuller than the note: notes are short, so a long phrase from the text probably contains more than the gap needs.

Worked example

Text: The town's repair café opens on the first Saturday of each month. Volunteers fix small electrical items and clothes, but they cannot take furniture because the hall has no room for it. Visitors pay nothing, although many leave a donation.

Notes: REPAIR CAFÉ Open: first Saturday of the month Will fix: small electrical items, clothes Furniture not accepted. Reason: lack of ____ at the hall Cost: free, donations welcome (ONE WORD ONLY)

较弱space. It means the same as the word in the text, and it sounds natural after 'lack of'.
更好room. The text says 'the hall has no room for it'. 'Lack of' rewords 'no', but the answer itself comes from the text.

Answers must be taken from words in the text, so a synonym of your own is not the answer, however close its meaning. Look back and find the text's word.

Fleydo IELTS 应用图标 Fleydo: IELTS 雅思备考

把这些测试装进手机,随身练习

这些页面上的每一套测试,也都收录在适用于 iPhone、iPad 和 Android 的 Fleydo: IELTS 雅思备考 应用中,另有 2,000 个带音频的雅思单词。

  • 测试下载到手机后即可离线使用
  • 2,000 个带音频的雅思单词,配合间隔重复和简短练习
  • 录下你的口语回答并回放
  • 根据你的目标 band 和考试日期制定每日计划
App Store 下载去 Google Play 商店下载
扫码下载会根据你的手机打开 App Store 或 Google Play。

无需账号。 了解应用

Fleydo: IELTS 雅思备考 应用中的雅思模拟题成绩:预估 band 和每个部分的正确率
免费试听课

在考试之前,先了解你真实的 IELTS 分数

与英语母语教师进行一次免费的一对一在线课程,教师为持有 8.5+ 分认证的 IELTS 专家。你将获得真实考试形式的 Speaking 诊断、诚实的分数评估,以及针对正在让你失分的评分标准的学习计划。无需付款,无需承诺。

在线 · 一对一 · Academic 与 General Training

IELTS(雅思)是 British Council、IDP: IELTS Australia 和 Cambridge University Press & Assessment 的注册商标。这些模拟题由 Fleydo 编写,未经上述机构认可或背书。

手机应用

Fleydo English School,尽在掌中

为 Fleydo 的学生和家长提供课程、作业、消息和游戏。iPhone 和 Android 均可免费使用。

App Store 下载去 Google Play 商店下载
了解应用详情
可在 App Store 或 Google Play 中打开 Fleydo English School 应用的二维码扫码下载自动打开适合您手机的应用商店。fleydo.com/app
Fleydo IELTS 应用图标
Fleydo: IELTS 雅思备考

正在备考 IELTS 雅思?

Fleydo: IELTS 雅思备考是一款单独的应用,提供四项技能的模拟测试。使用它不需要 Fleydo 账户。

了解 IELTS 雅思备考 App
App Store 下载去 Google Play 商店下载
雅思模拟题

练习雅思听说读写四项技能

311 项测试,即时出分,附答案解析和范文。无需注册。

全部模拟题
FleyPath

您孩子的个性化路线图——3、6 或 12 个月

🚀起点
👋Hello
😊Body
🦁Animals
🔢Numbers
🏆自信的英语
游戏化英语练习

像玩游戏 —— 只不过他们是真的在学习