Under the streets: building London's main drainage
A In the 1850s much of London's waste still ended up in the Thames. During the hot summer of 1858 the river fell, leaving sewage exposed along its banks, and the smell reached MPs at work in Parliament. A bill to pay for new works became law within 18 days. The task of carrying them out went to Joseph Bazalgette, chief engineer of the Metropolitan Board of Works, and construction began the following year.
B His scheme rested on interception: sewage would be caught before it could enter the river in the city and carried east to the lower Thames. Around 1,100 miles of street drains were to feed some 82 miles of brick-lined main sewers. These ran in three lines on each side of the river, named high, middle and low level, and gravity was expected to do most of the moving, as they sloped towards the east, at their lower ends by as little as two feet per mile.
C That arrangement could not serve everywhere. Much of the low ground south of the river, including Lambeth, lay below the high-water mark, in places by five or six feet, so sewage from low-lying sewers had to be raised by steam-driven pumps at key points. Abbey Mills, in east London, lifted it 36 feet. At Crossness, south of the river, four large engines delivered it into a reservoir, from which it was released, still untreated, at about high water, to be carried off on the ebbing tide.
D Building all this took a vast amount of material and muscle. Thousands of labourers dug the tunnels by hand, and the works swallowed 318 million bricks and 880,000 cubic yards of concrete. Demand for workers pushed up bricklayers' wages by 20 per cent. Bazalgette insisted on Portland cement, which was strong and water-resistant but was then looked on with suspicion because its quality was unreliable. Batches were checked under a quality-control system that he set up, and John Grant, an assistant engineer to the Board, began his experiments on the material in 1858.
E The dimensions of the tunnels were chosen with the future in mind. In a paper of 1865, Bazalgette explained that in crowded districts he had worked from the actual population. Where fewer people lived, he had allowed for growth to 30,000 per square mile, or to 20,000 in outlying districts, and he had assumed a more generous water supply than London then had. According to the London Museum, the tunnels were far larger than first needed, and when he died in 1891 they could still cope comfortably.
F Progress was far from smooth. In the same paper Bazalgette named strikes among the workmen as the main source of difficulty on the high-level sewer, and a long wet season stopped brick-making just as new railways were adding to the demand for bricks. One sewer also had to wait for another project altogether. Part of the low-level line north of the river was to run inside the new Victoria Embankment, which carried a road above an underground railway. When the Prince of Wales opened the system in 1865 this line was still unfinished, held back by the incomplete embankment, which did not open until 1870. The whole scheme was not completed until 1875.
G The beam engines at Crossness were decommissioned in the 1950s, and the engine house is now a museum. Abbey Mills, which replaced steam with electric motors in 1933, is still in use.
- Glossario
- sewage
- waste water and human waste carried away from buildings
- high-water mark
- the highest level that a river or the sea reaches at high tide
- ebbing tide
- a tide that is going out, as the water level falls
- Portland cement
- a strong type of cement used for building
- embankment
- a wall or bank built along a river to hold back the water
- beam engines
- large steam engines that work by means of a heavy rocking beam