1. 首页
  2. IELTS
  3. 模拟题
  4. Reading
  5. 雅思阅读 Short Answer 专项练习 2

IELTS Reading · 简答题

雅思阅读 Short Answer 专项练习 2

The Ghan railway

  • 11 道题
  • 15 分钟
  • Academic

本套测试包含

  1. Passage第 1–11 题The Ghan: a railway built in stages

题型

  • 简答题
Reading雅思阅读 Short Answer 专项练习 2
剩余时间15:00

Passage

The Ghan: a railway built in stages

A In February 2004 a passenger train left Adelaide, on Australia's southern coast, and arrived 47 hours later in Darwin, on the northern one. It was the end of a very long story. A Melbourne businessman had suggested a railway from Adelaide to the tropical north as early as 1858, and in 1872 a proposal to build one by granting land failed in the South Australian parliament.

B Construction began in 1878, at Port Augusta. An Act of 1876 had authorised a line from there to Government Gums, a place later renamed Farina, but the narrow-gauge track was pushed well beyond it, reaching Marree in 1884 and Oodnadatta in 1891. Far away at the other end of the continent, a separate line ran south from Darwin, then called Palmerston. It reached Pine Creek in 1888 and opened the following year.

C Oodnadatta remained the end of the southern line for almost 38 years, and beyond it camel teams carried supplies. Responsibility for the missing section changed hands in the meantime. Under an Act of 1910 the Commonwealth accepted the Northern Territory from South Australia and took on the duty of building a railway southwards from Port Darwin and connecting it with the southern line. The Act named no date by which this had to be done.

D Even then, progress was slow. Around the time of the First World War the northern line was extended to the banks of the Katherine River, and a train first crossed the river in 1926. The line was meant to carry on to Daly Waters, but funds ran out during the Depression, and in 1929 it stopped at Birdum, 509 km south of Darwin. That same year the southern line arrived at Alice Springs, and on 4 August the first Ghan passenger train left Adelaide for the town. The name is generally connected with the camel drivers who had opened a route into the centre of the country, although at least one other story explains it differently. Neither line ever crossed the roughly 1,000 km that still lay between Alice Springs and Birdum.

E Both lines had weaknesses. The northern one gradually lost customers and closed in 1976. The southern one suffered from water: flash floods washed away bridges and track, and passengers could be stranded for days. In October 1980 a replacement opened, built to the wider standard gauge and starting from Tarcoola, on a route further west that was less likely to flood. The trip from Adelaide to Alice Springs, which had taken almost 47 hours, now took just under 24, and the old line closed soon afterwards.

F Two governments, South Australia and the Northern Territory, then took up the last 1,420 km from Alice Springs to Darwin. They set up a corporation for the purpose in 1997, and in 1999 a group of companies was selected to build and run the railway. Work began with a ceremony at Alice Springs in July 2001. By December 2002 the stretch between Tennant Creek and Katherine was finished, and tracklaying reached Darwin and Alice Springs in September 2003. The project used some two million sleepers and employed 1,500 people at its peak. The first train from Adelaide to Darwin was a freight service, which left on 15 January 2004; the passenger Ghan followed on 1 February.

词汇表
gauge
the distance between the two rails of a railway track
the Commonwealth
Australia's national government
the Depression
the worldwide economic slump that began around 1929
sleepers
heavy beams laid under railway rails to hold them in place
Passage第 1–11 题
第 1–11 题 最多 3 个词

Answer the questions below. Choose NO MORE THAN THREE WORDS AND/OR A NUMBER from the text for each answer.

1What is the earliest year the text gives for the idea of a rail link between Adelaide and the north?
2What was Farina known as when the line to it was approved?
3Which town was the last stop on the southern track for nearly four decades?
4Under the 1910 Act, which government had to build the rest of the railway?
5Which river was first crossed by train in 1926?
6Which place did the northern line fail to reach because money ran out?
7Roughly how many kilometres still separated the two lines in 1929?
8What natural events destroyed parts of the southern line?
9From which place did the line opened in 1980 start?
10How many kilometres of new line were needed to join Alice Springs to Darwin?
11What kind of train was the first to run from Adelaide to Darwin?

答案与解析

建议先做题:作答之后再看答案,收获更大。

显示答案和解析
  1. 1
    1858

    The railway was suggested 'as early as 1858'. The year 1872 comes later in the same sentence and is when a proposal failed in parliament, so it is not the earliest year given.

  2. 2
    Government Gums

    The 1876 Act authorised a line 'to Government Gums, a place later renamed Farina'. Port Augusta is where the line started and Marree is a later stop, so neither was Farina's earlier name.

  3. 3
    Oodnadatta

    'Oodnadatta remained the end of the southern line for almost 38 years', which is nearly four decades. Marree was reached earlier, but the track went on past it. Copy the name carefully, because spelling counts.

  4. 4
    the Commonwealth government / the Commonwealth / Commonwealth government / Commonwealth

    Under the 1910 Act 'the Commonwealth' took on 'the duty of building a railway'. South Australia is the tempting wrong answer, but it was handing over the Northern Territory, not taking on the work.

  5. 5
    the Katherine River / the Katherine / Katherine River / Katherine

    The northern line was extended to 'the banks of the Katherine River', and 'a train first crossed the river in 1926'. Daly Waters and Birdum, named next, are places on land, not rivers.

  6. 6
    Daly Waters

    The line 'was meant to carry on to Daly Waters', but it 'stopped at Birdum' when funds ran out. Birdum is the place it did reach, so it is the wrong answer here.

  7. 7
    roughly 1,000 km / roughly 1,000 / 1,000 km / 1,000 / roughly 1000 km / roughly 1000 / 1000 km / 1000 / roughly 1,000km / 1,000km / roughly 1000km / 1000km / roughly 1,000 kilometres / 1,000 kilometres / roughly 1000 kilometres / 1000 kilometres / roughly 1,000 kilometers / 1,000 kilometers / roughly 1000 kilometers / 1000 kilometers / roughly one thousand kilometres / roughly one thousand / one thousand kilometres / one thousand / roughly a thousand / a thousand

    Paragraph D speaks of 'the roughly 1,000 km that still lay between Alice Springs and Birdum'. The 509 km earlier in the paragraph measures from Darwin to Birdum, not the gap between the lines.

  8. 8
    the flash floods / the floods / flash floods / floods

    The text says 'flash floods washed away bridges and track'. Bridges and track are what was damaged, not the cause, and 'water' on its own does not name an event.

  9. 9
    Tarcoola

    The 1980 replacement was built 'starting from Tarcoola'. Adelaide appears in the next sentence, but only as the start of the passengers' trip, not as the start of the new line.

  10. 10
    1,420 km / 1,420 / 1420 km / 1420 / 1,420km / 1420km / 1,420 kilometres / 1420 kilometres / 1,420 kilometers / 1420 kilometers

    The final stage was 'the last 1,420 km from Alice Springs to Darwin'. The 1,000 km in paragraph D was the 1929 gap between Alice Springs and Birdum, and 1,500 in this paragraph counts workers, so neither is the answer.

  11. 11
    a freight service / a freight / freight service / freight / a freight train / freight train

    'The first train from Adelaide to Darwin was a freight service', which left on 15 January 2004. The passenger Ghan followed on 1 February, so it was not first, even though the passage opens with it.

本卷关键词

Passage

proposal
a plan or suggestion put forward for others to consider
authorised
officially allowed
stranded
left in a place with no way of leaving
replacement
something that takes the place of another thing
corporation
a large company or official organisation
简答题:答题方法Answer factual questions in a few exact words from the text, in text order.

What the task looks like

The instruction says 'Answer the questions below.' You also get a limit, such as: Choose NO MORE THAN THREE WORDS AND/OR A NUMBER from the text for each answer.

The task tests specific factual detail. The answers come in the order of the text, so each one should appear after the one before. You do not write a full sentence.

A method to try

1. Mark the question word. 'Who' needs a person or group, 'where' a place, 'when' a time and 'how many' a number.

2. Mark any words that narrow the question down, such as 'in winter', 'first' or 'after the repairs'.

3. Scan for a name, number or topic word, starting after your last answer.

4. Read the sentence carefully, and check that your answer fits the narrowing words too.

5. Write the shortest answer that does the job, using the text's words, and count them.

The traps

Right information, too many words: small words such as 'at' and 'the' still count.

The wrong version of the fact: the text may give two times or two prices, one for summer and one for winter. Check which one the question wants.

Reworded questions: the question may say 'how long', when the text says 'lasts'. Look for the meaning, as you would in any other task.

Worked example

Text: The island's ferry crosses to the mainland three times a day. In winter the last crossing leaves at four in the afternoon, an hour earlier than in summer. Passengers with bicycles must buy their tickets at the harbour office, as bicycles cannot be booked online.

Question: Where do passengers with bicycles have to get their tickets? (NO MORE THAN THREE WORDS)

较弱at the harbour office. The information is right, and it sounds like natural English.
更好harbour office. These two words answer 'where'. Adding 'at the' makes four words, and going over the limit loses the mark.

Natural English is not the aim here. Give the fewest words that answer the question, then count them.

Fleydo IELTS 应用图标 Fleydo: IELTS 雅思备考

把这些测试装进手机,随身练习

这些页面上的每一套测试,也都收录在适用于 iPhone、iPad 和 Android 的 Fleydo: IELTS 雅思备考 应用中,另有 2,000 个带音频的雅思单词。

  • 测试下载到手机后即可离线使用
  • 2,000 个带音频的雅思单词,配合间隔重复和简短练习
  • 录下你的口语回答并回放
  • 根据你的目标 band 和考试日期制定每日计划
App Store 下载去 Google Play 商店下载
扫码下载会根据你的手机打开 App Store 或 Google Play。

无需账号。 了解应用

Fleydo: IELTS 雅思备考 应用中的雅思模拟题成绩:预估 band 和每个部分的正确率
免费试听课

在考试之前,先了解你真实的 IELTS 分数

与英语母语教师进行一次免费的一对一在线课程,教师为持有 8.5+ 分认证的 IELTS 专家。你将获得真实考试形式的 Speaking 诊断、诚实的分数评估,以及针对正在让你失分的评分标准的学习计划。无需付款,无需承诺。

在线 · 一对一 · Academic 与 General Training

IELTS(雅思)是 British Council、IDP: IELTS Australia 和 Cambridge University Press & Assessment 的注册商标。这些模拟题由 Fleydo 编写,未经上述机构认可或背书。

手机应用

Fleydo English School,尽在掌中

为 Fleydo 的学生和家长提供课程、作业、消息和游戏。iPhone 和 Android 均可免费使用。

App Store 下载去 Google Play 商店下载
了解应用详情
可在 App Store 或 Google Play 中打开 Fleydo English School 应用的二维码扫码下载自动打开适合您手机的应用商店。fleydo.com/app
Fleydo IELTS 应用图标
Fleydo: IELTS 雅思备考

正在备考 IELTS 雅思?

Fleydo: IELTS 雅思备考是一款单独的应用,提供四项技能的模拟测试。使用它不需要 Fleydo 账户。

了解 IELTS 雅思备考 App
App Store 下载去 Google Play 商店下载
雅思模拟题

练习雅思听说读写四项技能

311 项测试,即时出分,附答案解析和范文。无需注册。

全部模拟题
FleyPath

您孩子的个性化路线图——3、6 或 12 个月

🚀起点
👋Hello
😊Body
🦁Animals
🔢Numbers
🏆自信的英语
游戏化英语练习

像玩游戏 —— 只不过他们是真的在学习