Passage
The Ghan: a railway built in stages
A In February 2004 a passenger train left Adelaide, on Australia's southern coast, and arrived 47 hours later in Darwin, on the northern one. It was the end of a very long story. A Melbourne businessman had suggested a railway from Adelaide to the tropical north as early as 1858, and in 1872 a proposal to build one by granting land failed in the South Australian parliament.
B Construction began in 1878, at Port Augusta. An Act of 1876 had authorised a line from there to Government Gums, a place later renamed Farina, but the narrow-gauge track was pushed well beyond it, reaching Marree in 1884 and Oodnadatta in 1891. Far away at the other end of the continent, a separate line ran south from Darwin, then called Palmerston. It reached Pine Creek in 1888 and opened the following year.
C Oodnadatta remained the end of the southern line for almost 38 years, and beyond it camel teams carried supplies. Responsibility for the missing section changed hands in the meantime. Under an Act of 1910 the Commonwealth accepted the Northern Territory from South Australia and took on the duty of building a railway southwards from Port Darwin and connecting it with the southern line. The Act named no date by which this had to be done.
D Even then, progress was slow. Around the time of the First World War the northern line was extended to the banks of the Katherine River, and a train first crossed the river in 1926. The line was meant to carry on to Daly Waters, but funds ran out during the Depression, and in 1929 it stopped at Birdum, 509 km south of Darwin. That same year the southern line arrived at Alice Springs, and on 4 August the first Ghan passenger train left Adelaide for the town. The name is generally connected with the camel drivers who had opened a route into the centre of the country, although at least one other story explains it differently. Neither line ever crossed the roughly 1,000 km that still lay between Alice Springs and Birdum.
E Both lines had weaknesses. The northern one gradually lost customers and closed in 1976. The southern one suffered from water: flash floods washed away bridges and track, and passengers could be stranded for days. In October 1980 a replacement opened, built to the wider standard gauge and starting from Tarcoola, on a route further west that was less likely to flood. The trip from Adelaide to Alice Springs, which had taken almost 47 hours, now took just under 24, and the old line closed soon afterwards.
F Two governments, South Australia and the Northern Territory, then took up the last 1,420 km from Alice Springs to Darwin. They set up a corporation for the purpose in 1997, and in 1999 a group of companies was selected to build and run the railway. Work began with a ceremony at Alice Springs in July 2001. By December 2002 the stretch between Tennant Creek and Katherine was finished, and tracklaying reached Darwin and Alice Springs in September 2003. The project used some two million sleepers and employed 1,500 people at its peak. The first train from Adelaide to Darwin was a freight service, which left on 15 January 2004; the passenger Ghan followed on 1 February.
- শব্দকোষ
- gauge
- the distance between the two rails of a railway track
- the Commonwealth
- Australia's national government
- the Depression
- the worldwide economic slump that began around 1929
- sleepers
- heavy beams laid under railway rails to hold them in place